Introduction
Energy Dispersive X-Ray Fluorescence Spectrometer is an advanced testing system for environment compliance testing. Within the range of 1 ppm to 99.99%, it features an elemental analysis spanning from Na to U. The device uses a vacuumizer to ensure better response to environmental directives. Integrated SDD testing system improves accuracy of the detection. Streamlined body with the Si-pin detector elevates data analysis accuracy.
Applications
Energy Dispersive X-Ray Fluorescence Spectrometer is used environmental compliance testing across electronics manufacturing, production, recycling and waste management, automotive industries, etc.
Specifications
| Elemental Analysis Range | From Na to U |
| Analytical range | 1 ppm to 99.99% |
| Operating temperature | 15 to 30 ℃ |
| Relative humidity | 40% to 50% |
| Measuring time | 100 to 300 seconds (Adjustable) |
| ROHS directive rules | Limited detection up to 1 ppm |
| Energy resolution | 149 ± 5 EV |
| SDD Electrical Cooled Detector distinguishability | 129 ± 5 e electron volt |
| Filament Current Maximum Output | 1 Ma |
| Half Loss Component | Service life > 20,000 hours |
| Maximum Output Voltage | 50 kV |
| Vacuum Pumping System | Low vibration, low noise, self-protection, fast pumping speed |
| Geometric Pumping Speed of vacuum system | 60 L/min |
| Ultimate Pressure of vacuum system | 6.7 × 10^ -2 Pa |
| Power Supply | AC 220 V ± 5 V |
| Packaging Dimension | 580 × 550 × 400 mm |
| Weight | 80 Kg |
Features
One-click automatic testing for user’s convenience
Multiple anti-radiation leak design for safety
Professional ROHS testing software
Energy Dispersive X-Ray Fluorescence Spectrometer requires low maintenance
USB 2.0 interface for efficient data transmission
FAQ
Q1: What is the main application of this laboratory equipment?
A1: It is mainly used for general laboratory sample processing in laboratory settings, such as sample preparation, analysis, or processing.
Q2: Does the product come with a warranty?
A2: Yes, it provides a 1-year warranty for the main unit (excluding consumable parts), covering manufacturing defects and quality issues.
Q3: Is installation required after receiving the product?
A3: No, it is ready to use after unpacking. Simply connect the power supply (confirm the voltage matches) and follow the operation manual.
Q4: What are the power supply requirements?
A4: It supports AC 220V/50Hz or 110V/60Hz (selectable based on region), please confirm the voltage specification before use.
Q5: How to get technical support if there is a problem?
A5: You can contact our technical support team via email or phone. We provide online troubleshooting guidance and on-site service if needed.
Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.

