Introduction

A rotary evaporator is used for solvent removal and concentration under reduced pressure. It is widely used in chemical, pharmaceutical, and research laboratories for sample preparation.

暂无信息

Standards

ISO/TS 6417:2025-Microfluidic pumps-Symbols and performance communication

ISO 13137:2022-Workplace atmospheres-Pumps for personal sampling of chemical and biological agents-Requirements and test methods

Complies with the above standards, but is not limited to them.

Features

1. Thermal and overload protection extend service life.

2. Integrated inlet trap protects the pump from particles.

3. Oil-free or sealed designs reduce contamination and maintenance.

4. Stable flow or vacuum supports repeatable processes.

5. Inlet and exhaust ports accept standard tubing.

FAQ

What are the main applications of the Batch Transfer Peristaltic Pump?

The Batch Transfer Peristaltic Pump is used to move, evacuate or transfer fluids and gases in laboratory and process work. It supports filtration, vacuum drying, aspiration, chromatography and sample handling.

Which standards and regulations apply to the Batch Transfer Peristaltic Pump?

The pump is designed with reference to IEC 61010 electrical safety and relevant GB/T standards for laboratory pumps. Vacuum and pressure ratings should match the application. Compliance documentation can be provided on request.

How long is the warranty period?

A 12-month warranty applies to the complete equipment against defects in materials and workmanship. It excludes consumables, wearing components and accidental or misuse damage. Our service team handles claims against the serial number, and longer cover can be arranged.

Is the Batch Transfer Peristaltic Pump difficult to operate?

No advanced specialist skills are needed for standard operation, though correct sample handling and safety practice should be followed. We supply a detailed manual and start-up support. For multi-user or regulated sites, a short staff training session can be arranged.

What is the typical lead time for order delivery?

Standard models require 7-30 working days. In-stock units can ship within 3-7 working days. Custom configurations or large built-to-order systems may require additional time, and we confirm the exact schedule before order confirmation.

Is calibration included?

The unit is calibrated and tested before delivery. For ongoing accuracy, verify it against traceable reference standards every 6 to 12 months, or according to the laboratory quality schedule. We can arrange calibration service and certificates where required.

Where do we get replacement parts?

Common consumables and standard spare parts are available through our service channel and are not locked to proprietary formats. Quote the model and serial number when ordering so the correct items are supplied. Lead time for standard parts is usually short.

Can it be adapted to our requirements?

Customisation is supported for many installations, including tailored parameters, connections and accessories. Our team reviews the requirement and confirms feasibility and lead time in advance. We avoid committing to options that cannot be delivered reliably.

Is installation and commissioning included?

Standard installation is straightforward and supported by the manual and start-up documentation. Our technical team can guide staff remotely through checks and validation. On-site commissioning is available as a quoted service.

What should be avoided when using the Batch Transfer Peristaltic Pump?

Do not pump incompatible, corrosive or particulate media without protection, run dry or block exhaust. Use traps and inlet filtration. Follow laboratory safety rules.

Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.

Inquiry