Introduction

Vertical Electrophoresis System provides casting capacity of 1 to 4 gels. Its 1000 mL buffer volume supports efficient cooling and consistent current flow during multi-gel runs. Its quick assembly configuration allows fast, hassle-free setup. Its edge-sealing gasket is permanently fixed to the thick glass plate, ensuring alignment and preventing adhesive leakage. Vertical Electrophoresis System is ideal for SDS-PAGE, protein separation, and Western blot preparation. 

Manufactured under strict quality control processes, complying with international laboratory equipment standards. Provides 1-year warranty for main components and lifetime technical support.

Applications

Vertical Electrophoresis System is ideal for SDS-PAGE, native PAGE, protein separation, and Western blot preparation across academic, biotechnology, clinical, and pharmaceutical laboratories. 

Specifications

Gel Number 1 to 4
Gel Size Hand‑cast: 83 × 73 mm, Pre‑cast: 86 × 68 mm
Glass Plate Size Thick Glass: 101 × 82 mm, Short Glass: 101 × 73 mm
Comb Options 10 or 15 teeth
Comb thickness 1.0 mm
Buffer Volume 1000 mL
Gel Run Time 35 to 45 minutes (Standard SDS‑PAGE)
Power Consumption 600 V
External Dimensions 180 × 140 × 200 mm
Net Weight 2 kg

Features

High Gel Capacity 

Optimized comb structure

Transparent Gel Tank 

Integrated Safety Lid 

Polycarbonate injection molding

FAQs

1. What is the main function of this Vertical Electrophoresis System?

It is a professional laboratory instrument designed for Vertical Electrophoresis System applications, providing accurate, reliable performance for sample analysis, processing, or storage in scientific research and industrial quality control.

2. What are the key advantages of this Vertical Electrophoresis System compared to similar products?

It combines high performance, user-friendly operation, and robust construction. The compliance with international standards and certifications ensures its reliability and suitability for various laboratory environments.

3. What regular maintenance is required for this Vertical Electrophoresis System?

General maintenance recommendations: 1) Keeping the instrument clean and free from dust and debris; 2) Following the manufacturer's calibration schedule to maintain accuracy; 3) Inspecting electrical connections and mechanical parts periodically for signs of wear; 4) Storing and using the instrument according to the operating manual to prevent damage.

4. What are the installation requirements for this Vertical Electrophoresis System?

Standard installation requirements: 1) Placing on a stable, level workbench in a clean laboratory environment; 2) Connecting to a properly grounded power supply matching the instrument's voltage requirements; 3) Ensuring adequate space for operation and maintenance; 4) Following any specific environmental conditions (temperature, humidity, ventilation) outlined in the product manual.

5. What should I do if the Vertical Electrophoresis System shows abnormal operation?

General troubleshooting guidelines: 1) First check the power supply and all connections to ensure they are secure; 2) Refer to the user manual's troubleshooting section for specific error messages or symptoms; 3) Perform a system reset if applicable; 4) Do not attempt to repair internal components without professional training; contact authorized service personnel for technical support when needed.

Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.