Introduction
Vertical Electrophoresis System is designed with dual cooling mechanism and capacity to transfer two gels simultaneously. It features high-transparency polycarbonate injection molding for durability and visibility. Equipped with dedicated open gel sandwich clip for convenient operation. Incorporates built-in chiller to quickly absorb heat during transfer. Electrophoresis Unit enables protein transfer for small gels in research and biochemical analysis.
Manufactured under strict quality control processes, complying with international laboratory equipment standards. Provides 1-year warranty for main components and lifetime technical support.
Applications
Vertical Electrophoresis System blot transfer and high-quality protein electrophoresis for small gels in laboratory research and biochemical analysis. It facilitates efficient gel transfer for protein detection in Western blotting and molecular biology.
Specifications
| Number Of Gels | 2 |
| Transfer Time | 1 hour |
| Material | Polycarbonate |
| Electrode Material | High-purity platinum |
| Cooling System | Yes |
| Color Marking | Red and black |
| Electrode Filament Distance | 4 cm |
| Gel Size (L×W) | 100×75 mm |
Features
Strong electric field
Corrosion-resistant electrodes
Red/black orientation marks
Rapid or overnight transfer
Standard Accessories
FAQs
1. What is the main function of this Vertical Electrophoresis System?
It is a professional laboratory instrument designed for Vertical Electrophoresis System applications, providing accurate, reliable performance for sample analysis, processing, or storage in scientific research and industrial quality control.
2. What are the key advantages of this Vertical Electrophoresis System compared to similar products?
It combines high performance, user-friendly operation, and robust construction. The compliance with international standards and certifications ensures its reliability and suitability for various laboratory environments.
3. What regular maintenance is required for this Vertical Electrophoresis System?
General maintenance recommendations: 1) Keeping the instrument clean and free from dust and debris; 2) Following the manufacturer's calibration schedule to maintain accuracy; 3) Inspecting electrical connections and mechanical parts periodically for signs of wear; 4) Storing and using the instrument according to the operating manual to prevent damage.
4. What are the installation requirements for this Vertical Electrophoresis System?
Standard installation requirements: 1) Placing on a stable, level workbench in a clean laboratory environment; 2) Connecting to a properly grounded power supply matching the instrument's voltage requirements; 3) Ensuring adequate space for operation and maintenance; 4) Following any specific environmental conditions (temperature, humidity, ventilation) outlined in the product manual.
5. What should I do if the Vertical Electrophoresis System shows abnormal operation?
General troubleshooting guidelines: 1) First check the power supply and all connections to ensure they are secure; 2) Refer to the user manual's troubleshooting section for specific error messages or symptoms; 3) Perform a system reset if applicable; 4) Do not attempt to repair internal components without professional training; contact authorized service personnel for technical support when needed.
Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.

