Introduction

Vertical Electrophoresis System is equipped with casting capacity of 1 to 2 gels. Its optimized comb structure ensures uniform well formation and prevents air exposure during polymerization. Its leakage-proof construct ensures secure buffer containment system, minimizing risk of spills. Its polycarbonate injection molding offers high durability and ease of handling routine gel runs. Vertical Electrophoresis System is ideal for separation of serum proteins, recombinant enzymes, and membrane proteins.

Manufactured under strict quality control processes, complying with international laboratory equipment standards. Provides 1-year warranty for main components and lifetime technical support.

Applications

Vertical Electrophoresis System is ideal for Western blotting sample preparation, SDS-PAGE, and native PAGE-based separation of serum proteins, recombinant enzymes, and membrane proteins. 

Specifications

Gel Number 1 to 2
Gel Size Hand‑cast: 83 × 73 mm, Pre‑cast: 86 × 68 mm
Glass Plate Size Thick Glass: 101 × 82 mm, Short Glass: 101 × 73 mm
Comb Options 10 or 15 teeth
Comb thickness 1.0 mm
Buffer Volume 700 mL
Gel Run Time 35 to 45 minutes (Standard SDS‑PAGE)
Power Consumption 600 V
External Dimension 180 × 140 × 200 mm
Net Weight 2 kg

Features

Quick Assembly Configuration 

High Gel Capacity 

Edge-Sealed Glass Plates

Transparent Gel Tank 

Integrated Safety Lid 

FAQs

1. What is the main function of this Vertical Electrophoresis System?

It is a professional laboratory instrument designed for Vertical Electrophoresis System applications, providing accurate, reliable performance for sample analysis, processing, or storage in scientific research and industrial quality control.

2. What are the key advantages of this Vertical Electrophoresis System compared to similar products?

It combines high performance, user-friendly operation, and robust construction. The compliance with international standards and certifications ensures its reliability and suitability for various laboratory environments.

3. What regular maintenance is required for this Vertical Electrophoresis System?

General maintenance recommendations: 1) Keeping the instrument clean and free from dust and debris; 2) Following the manufacturer's calibration schedule to maintain accuracy; 3) Inspecting electrical connections and mechanical parts periodically for signs of wear; 4) Storing and using the instrument according to the operating manual to prevent damage.

4. What are the installation requirements for this Vertical Electrophoresis System?

Standard installation requirements: 1) Placing on a stable, level workbench in a clean laboratory environment; 2) Connecting to a properly grounded power supply matching the instrument's voltage requirements; 3) Ensuring adequate space for operation and maintenance; 4) Following any specific environmental conditions (temperature, humidity, ventilation) outlined in the product manual.

5. What should I do if the Vertical Electrophoresis System shows abnormal operation?

General troubleshooting guidelines: 1) First check the power supply and all connections to ensure they are secure; 2) Refer to the user manual's troubleshooting section for specific error messages or symptoms; 3) Perform a system reset if applicable; 4) Do not attempt to repair internal components without professional training; contact authorized service personnel for technical support when needed.

Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.