Introduction
Mould Cultivation Cabinet is a specialized enclosure designed for controlled and sterile conditions to facilitate the cultivation of molds and fungi for research or industrial purposes. Constructed with materials that minimize contamination risks, the cabinet often features adjustable shelves, temperature, and humidity controls, creating an ideal environment for mold growth. Equipped with airtight seals, HEPA filters, and UV sterilization, these cabinets maintain a clean and controlled atmosphere, preventing cross-contamination and ensuring reliable experimental outcomes.
Mould Cultivation Cabinet T-S221MCC
Mould Cultivation Cabinet is a double door structure thermostatic equipment controlled by PID controller. It is equipped with automated temperature and humidity control system with its se...
Mould Cultivation Cabinet T-S222MCC
Mould Cultivation Cabinet is a double door structure thermostatic equipment controlled by PID controller. It is equipped with automated temperature and humidity control system with its se...
Mould Cultivation Cabinet T-S220MCC
Mould Cultivation Cabinet is a double door structure thermostatic equipment controlled by PID controller. It is equipped with automated temperature and humidity control system with its se...
Standards
Complies with the above standards, but is not limited to them.
Features
1. Ships with a start-up kit and traceable factory test record.
2. Pre-set routines shorten set-up for repeated standard procedures.
3. Safety devices protect samples, the unit and the operator.
4. Easy cleaning and maintenance extend service life.
5. Data output or recording supports traceable records.
FAQ
What is the Mould Cultivation Cabinet mainly used for?
The Mould Cultivation Cabinet is used for a defined laboratory measurement, preparation or processing task. It supports analytical, quality-control, research, clinical or industrial work where consistent, repeatable results are required.
Which standards and regulations apply to the Mould Cultivation Cabinet?
The instrument is designed with reference to IEC 61010 electrical safety, the applicable international standard for the measurement or process and relevant GB/T standards. Procedures should follow the relevant method. Compliance documentation can be provided on request.
What does the warranty cover?
The complete unit carries a 12-month warranty from delivery, covering the main body, core components and controller against manufacturing defects. Consumables and wearing parts such as filters, seals and probes are not covered. Damage from misuse, improper power or unauthorised repair is excluded, and extended warranty can be quoted.
Is the Mould Cultivation Cabinet difficult to operate?
Day-to-day use is simple, with clear prompts and pre-set functions reducing manual steps. New operators should review the manual and complete a short familiarisation. Our technical team offers remote support during the first runs.
How long does delivery usually take?
Standard models require 7-30 working days. In-stock units can ship within 3-7 working days. Custom configurations or large built-to-order systems may require additional time, and we confirm the exact schedule before order confirmation.
How often should the Mould Cultivation Cabinet be calibrated?
The unit is calibrated and tested before delivery. For ongoing accuracy, verify it against traceable reference standards every 6 to 12 months, or according to the laboratory quality schedule. We can arrange calibration service and certificates where required.
Are the consumables universal or proprietary?
The instrument uses standard, widely available consumables rather than special locked items. Replacement parts, accessories and consumables can be ordered from us against the model number. We keep common service parts in stock for prompt supply.
Can it be adapted to our requirements?
The standard model can be configured with selected accessories and operating options to suit the task. Non-standard requests are assessed before quotation so the final build is clearly defined. We confirm details before production.
Is installation and commissioning included?
The unit is delivered ready for set-up, with clear commissioning steps in the manual. We provide remote technical support during installation. For larger or regulated systems, a factory-trained engineer can attend on site on request.
What maintenance and safety points matter?
Do not use the instrument outside its rated range or intended samples, skip calibration or ignore safety and maintenance instructions. Follow the operating manual and laboratory safety rules.
Tips: For more details, quotes and customized solutions, please contact us anytime. We’re always ready to serve you professionally.



